Skip to content
History & Civics

The Golden Spike and the First Transcontinental Railroad

By Tom Brennan · Published · 7 min read

Old railroad tracks running across dry desert hills

Shortly before one o’clock on May 10, 1869, two railroad executives took turns swinging a silver-plated hammer at a golden spike in the high desert of Utah. Both of them missed. Construction supervisors then took turns driving the actual last spike, an ordinary iron one, and at 12:47 p.m. a telegraph operator sent a single word across the wires to a country that was waiting for it: done.

The fumbled swing is the kind of detail that gets lost behind the grand picture of the first transcontinental railroad. It was a human moment at the end of a six-year effort that had involved thousands of workers, two rival companies and a landscape that did not want to be crossed.

Four Special Spikes and a Laurelwood Tie

The ceremony at Promontory Summit was staged with ceremonial pieces donated by well-wishers. Here is what was set out for the occasion.

  • The gold spike: a San Francisco contractor named David Hewes paid for it with his own gold. It was cast in a San Francisco foundry, measures about five and five-eighths inches, and is engraved with the words “The Last Spike” on top.
  • A second gold spike: this one was ordered by a San Francisco newspaper, the News Letter. Its whereabouts are unknown.
  • Nevada’s silver spike: forged by a blacksmith from about twenty-five ounces of silver supplied by assayers in Virginia City.
  • Arizona’s spike: an ordinary iron spike with a gold-plated head and a silver-plated shaft, presented by the territory’s governor.
  • The laurelwood tie: a polished California laurelwood tie, with holes drilled in advance for the four special spikes.

Gold is soft, so the dignitaries tapped the precious spikes rather than pounding them. Afterward the special tie and spikes were pulled out and replaced with a plain pine tie and iron spikes. The golden spike went back to Hewes and was later donated to the museum at Stanford University. The laurelwood tie went to San Francisco and was destroyed in the 1906 earthquake and fire.

The golden spike carries an engraved date of May 8, 1869, the day the ceremony was originally planned. Delays on the Union Pacific side pushed it back two days.

Two Companies Racing Toward Each Other

Congress authorized the transcontinental line in 1862 and passed a supplementary act in 1864. The plan gave two companies the job: the Central Pacific would build east from Sacramento, and the Union Pacific would build west from the Missouri River. Each was rewarded for the miles it finished, so each had a reason to cover as much ground as possible.

The government issued bonds at $16,000 per mile of completed grade on the flat stretches, $32,000 between the mountain ranges and $48,000 over the mountains themselves, and it added land grants along the route. A later act fixed the track gauge at four feet eight and a half inches, which became the standard for American railroads.

The Central Pacific was backed by four Sacramento merchants, Leland Stanford, Collis Huntington, Mark Hopkins and Charles Crocker, known as the Big Four. Each put in only $1,500 at the start, and all four later became very wealthy.

The Central Pacific broke ground in Sacramento on January 8, 1863. Its chief engineer Theodore Judah had surveyed a route through the Sierra Nevada, but he died of yellow fever in November of that year and never saw the line completed. Union Pacific construction began in earnest in the summer of 1865.

By the end, the two companies were laying track toward each other in such a hurry that their crews graded parallel lines past the meeting point. The final location, Promontory Summit, was settled by Congress.

The Union Pacific’s finances later grew into the Crédit Mobilier scandal, which came to light in 1872 and tarnished the reputations of several public figures.

Who Actually Built It

The hardest work on the Central Pacific was done mostly by Chinese immigrants. The company started with a few dozen Chinese workers and hired many thousands more. By the National Park Service’s account, they were paid about 30 percent less than white workers on average, lived in segregated camps, and covered their own lodging and food.

They blasted tunnels through solid Sierra granite and worked through avalanches and winter storms. Estimates of how many died run above a thousand, but no accurate count exists, because the company did not record their names. On June 24, 1867, Chinese workers along a 30-mile stretch walked off the job. They asked for higher pay and shorter shifts, and the strike lasted about a week, until the company cut off food and supplies to their camps.

The Union Pacific’s crews drew on discharged soldiers from both Union and Confederate armies, along with Irish immigrants. Around 2,000 Latter-day Saint workers, recruited through contracts negotiated by Brigham Young, built much of the line through Utah. The railroad did not pay all of them the full wages it had promised.

Granite and Snow

The hardest ground lay in the Sierra Nevada. Summit Tunnel, the longest on the line at 1,659 feet, had to be cut through solid granite at an elevation above 7,000 feet. Work began in October 1865 and ran for about two years.

Black powder was slow going. In February 1867, the crews began using nitroglycerin, which had never before been used for construction in the United States, and a chemist made it on the spot. Crews also sank a central shaft so they could work on four rock faces at once, and with the new explosive each face could advance up to two feet a day.

The winter of 1866 and 1867 was brutal, with 44 separate storms and an average snowpack of about eighteen feet at the summit. Avalanches killed workers, and the railroad lost an uncounted number of men to the snow. When the crews broke through from opposite directions in August 1867, their alignment was off by only about two inches, and the first locomotive passed through that December.

Ten Miles in One Day

A few weeks before the ceremony, the rivalry produced a stunt. The Union Pacific had once laid 8.5 miles of track in a single day, and Central Pacific construction chief Charles Crocker was determined to beat it. He waited until the gap between the two lines was so short that the other side could not answer.

On April 28, 1869, the Central Pacific laid 10 miles and 56 feet of track in one day. Eight Irish track layers did the rail handling at the front of the line, with at least 400 Chinese workers behind them tamping ballast, spiking rails and bolting the rails together. A record that required that much teamwork has been hard to top.

On May 10, eight Chinese workers carried the final rail into place for the ceremony.

The Picture and Who Wasn’t in It

The best-known image of the day is a photograph by Andrew J. Russell, who documented the Union Pacific’s construction, taken as the two locomotives stood nose to nose. Union Pacific’s No. 119 faced the Central Pacific’s Jupiter, with engineers and officials shaking hands and workers crowded in between, bottles held high.

The Chinese workers who had done so much of the labor do not appear in the best-known frame. Their names were also left out of the newspaper accounts, and many twentieth-century histories overlooked them. The National Park Service calls them the “Silent Spikes,” because no known letters or diaries of theirs survive.

That gap in the record is one reason historians keep returning to the labor side of the story.

What Changed After the Last Spike

The railroad did what supporters had promised. A trip across the country that had taken months by wagon or stagecoach could now be done in days, at a fraction of the cost.

An unexpected side effect came from the clocks. Each railroad ran on its own time, and cities set their clocks by local noon, so timetables turned into puzzles. The railroads adopted standard time zones on November 18, 1883, a day sometimes called “the day of two noons” because many clocks were set back to match their new zone.

The place began as a tent city and grew into a small town. The ceremony site itself later faded. The railroad rerouted its main line across the Great Salt Lake in 1904, and the original track at Promontory was eventually pulled up. The place is a national historical park, where replica locomotives meet on the original grade.

Keep reading